State Road 9/I-95 at Central Boulevard Project
District Office
Gerry O'Reilly
District Four Secretary
3400 W Commercial Blvd
Fort Lauderdale, FL 33309
Tel: 954-777-4100
Toll-Free: 1-866-336-8435
Fax: 954-777-4197
E-Mail Us
Additional Contacts
Staff Directory
Welcome
The I-95 at Central Boulevard Interchange Project has been approved by the Federal Highway Administration (FHWA). FHWA granted Location and Design Concept Acceptance (LDCA) for the Project Development and Environment (PD&E) Study prepared for the interchange project on November 28, 2016. For more information, please visit the Documents & Publications page.
The project is currently in the final design phase and involves a new diamond interchange at I-95 and Central Boulevard, including new Collector-Distributor roadways between Military Trail and Donald Ross Road as well as improvements to Central Boulevard. Mainline I-95 roadway improvements will consist of pavement resurfacing and widening. The existing Central Boulevard bridge spanning I-95 will be widened and will include two 11‐foot wide through lanes, two 11‐foot wide left turn lanes, a 7-foot wide buffered bicycle lane, and a 10‐foot wide sidewalk in each direction.
Project At-A-Glance
District
Four (Southeast Florida)
Construction Start Date
TBD
Est. Completion Date
TBD
Cost
$85.9 million
Lengths and Limits
The project extends along I-95 for approximately 2.8 miles from Military Trail on the south (milepost 37.206) to Donald Ross Road on the north (milepost 40.067)
Consultant
RS&H, Inc.
Project Manager
Bing Wang, PE